We undertake a wide variety of demolition works from single residential houses to large industrial & commercial properties. This includes prefabricated buildings, traditional brick construction as well as steel or concrete framed structures.
THE MEADOWS, NOTTINGHAM
| Client | Housing Association | | Acting as ... | Principal Contractor | | Start date | July 2006 | | Value, Łk | 75 | | Duration, wks | 6 | | Footprint, m2 | 400 | Demolition of a day hospital (superstructure & substructure) in a residential area including site clearance, removal of underground obstructions and erection of a semi-permanent hoarding around the site.
CHILWELL, NOTTINGHAM
| Client | House Builder | | Acting as ... | Principal Contractor | | Start date | February 2006 | | Value, Łk | 15 | | Duration, wks | 2 | | Footprint, m2 | 130 | Demolition of a traditional detached brick built 1930's residential property.
WEST BRIDGFORD, NOTTINGHAM
| Client | House Builder | | Acting as ... | Principal Contractor | | Start date | March 2005 | | Value, Łk | 27 | | Duration, wks | 2 | | Footprint, m2 | 100 | Demolition of a traditional semi-detached three storey brick built Victorian property used as a retail outlet. The property fronted onto a busy main road with occupied retail properties either side requiring hand demolition down to first floor level.
LITTLEOVER, DERBY
| Client | House Builder | | Acting as ... | Principal Contractor | | Start date | February 2005 | | Value, Łk | 35 | | Duration, wks | 4 | | Footprint, m2 | 450 | Demolition of a large traditional brick & block detached two storey care home.
ROAD BRIDGE, MANSFIELD
| Client | Local Council | | Acting as ... | Contractor | | Start date | April 2002 | | Value, Łk | 43 | | Duration, wks | 3 | Demolition of a pre-stressed beam road bridge. Including bulk earthworks fill to construct new road embankment.
 View from Railway Cutting  View of Road over Bridge  Bridge Deck Removal 1  Bridge Deck Removal 2 NETHERFIELD, NOTTINGHAM
| Client | House Builder | | Acting as ... | Principal Contractor | | Start date | March 2001 | | Value, Łk | 80 | | Duration, wks | 4 | | Footprint, m2 | 4,500 | Demolition of an industrial unit. Brick and steel clad building with internally linned cement bonded asbestos roof. Included the removal of underground fuel storage tanks.
|